Service · 26 09 23 / 26 09 43

Lighting controls design

Protocol selection, zoning, addressing and a written sequence of operations — the documentation set a contractor builds from, and a commissioning agent verifies against.

Where controls projects fail

Controls rarely fail because the hardware is wrong. They fail because the intent was never written down in verifiable terms. A drawing that says occupancy sensors throughout leaves the timeout, the dimmed level, the daylight setpoint and the emergency behaviour to whoever is on site that week. Nobody can commission against that, and nobody can prove it was wrong later.

The fix is unglamorous: state every setpoint as a value, assign every luminaire to a group before installation, and put the whole thing on one document that the electrical and controls trades both work from.

Protocols and platforms

DALI and DALI-2, 0-10V, DMX, ELV, PWM, and the platform layers built on them — Casambi, OSRAM Encelium, Traxon e:cue, BubblyNet. Protocol selection is driven by what the space needs to do and who will maintain it, not by which system a rep is carrying.

Bus topology, address count, group and scene allocation, power supply sizing and cable limits are all worked out in the design rather than discovered during rough-in.

What you receive

A single-line controls riser; a device and group schedule with every address assigned; a written sequence of operations with occupancy timeouts, dimmed levels, daylight setpoints and emergency behaviour stated as values; and where lighting reports to a building management system, the points list and gateway requirements specified alongside.

The sequence is written to be tested. Each line describes a condition and the response it produces, which is what turns commissioning from an argument into a checklist.

Common questions

Which protocol should my project use?

It depends on the zoning granularity you need, whether the space requires scenes and colour control, and who maintains the building. DALI-2 earns its cost where addressable control and emergency self-test reporting matter. 0-10V is often sufficient for straightforward industrial zoning. The recommendation comes with the reasoning attached.

Can you write a sequence of operations for an existing system?

Yes. Documenting an installed system that was never specified properly is common, and it is usually the cheapest way to make a building's lighting controllable again.

Do you commission the system?

The design and the documentation are the deliverable, along with a review session with your contractor or commissioning agent. The sequence is written so that whoever commissions has a testable document to work from.

How does this coordinate with the BMS?

The points list and gateway requirements are specified with the riser, so the controls contractor and the BMS integrator are working from one document rather than negotiating during startup.

Start a project

A few lines is enough: the space, the levels it has to hit, and when it’s needed. You get a written scope, a fee and a schedule back, normally within two business days.